Protection
Waterproofing
Wet-area waterproofing completed properly, before anything covers it up.
The work
Waterproofing is the layer nobody sees and the one that decides whether a bathroom lasts. It has to be continuous, correctly detailed at every junction, and given the time it needs to cure before tiling starts.
Corners and wall-to-floor junctions are reinforced, penetrations are sealed, and coats are applied to the required thickness rather than the required appearance.
What’s included
- 01Surface preparation and priming
- 02Bond breakers and reinforcing at junctions
- 03Sealing of penetrations and floor wastes
- 04Multi-coat application to wet-area requirements
- 05Cure time before tiling begins
Free quote
Tell us about your project.
Send through the room, the rough size and a few photos. We will come back with a considered quote — not a number pulled out of the air.
